Navigation path

The quarterly report on NPP events (October-December 2018) has been published

The quarterly report on NPP events (October-December 2018) has been published


Description

This newsletter provides feedback on Operating Experience (OE) from significant safety related events at nuclear power plants (NPPs) worldwide, every three months.

This Quarterly Report compiles the NPP events that were reported publicly during the period from 1st October to 31st December 2018.

Five events were selected from the short-list for this Newsletter:

1. 11/09/2018: Pressurizer instrument nozzle leak due to primary water stress corrosion cracking (US / ST LUCIE 2).

2. 30/09/2018: Automatic reactor scram due to loss of two condensate pumps (US / PEACH BOTTOM 3).

3. 25/10/2018: Insufficient seismic resistance of a bolted assembly (FRANCE / CHINON B1/B2).

4. 08/11/2018: Late detection of loose electrical connections on several valves of the RHR system (FRANCE / CIVAUX 1).

5. 04/12/2018: Catwalks not compliant with seismic resistance requirements (FRANCE / MULTI-SITE).

Please see attachment for more details.

* In order to access the restricted areas, please first login. You can do so by using the ECAS user registration details. Please contact the administrator in case you experiment any problems or have further questions or comments.

Others

Attachments: